The frequency of inspections will be 4 times during the term of this Agreement.
- A Spring Annual A Spring Inspection
- A Fall Annual
- A Fall Inspection
NOTES PERTAINING TO PLANNED MAINTENANCE
A. REPORTING
Air Therm will generate a work summary report at the end of each inspection outlining the work performed, problems found (if any) and recommendations for items requiring additional attention (if applicable) pertaining only to the equipment covered in Schedule A
B. EMERGENCY RESPONSE TIME
It is Air Therm’s intention to provide same day service. For calls received between 8:00am – 12:00pm (M-F) Air Therm will typically respond the same day. For calls received after 12:00 pm Air Therm may respond the same day or or more likely the following day.
Please note that while it is our intention to operate as noted above, it is possible during times of extreme temperatures that we may fall outside of these guidelines and Air Therm shall not be liable to you for any consequential and/or incidental damages associated therewith, if any.
AGREEMENT AND TERMS AND CONDITIONS
This initial term of this Service Agreement shall be (1) year(s) effective If the Agreement is accepted on or before the 15th of the month the effective start date will be the 1st of that month. If the agreement is accepted on or after the 16th of the month the effective start date will be the 1st of the following month.
This proposal is subject to Air Therm LLC Standard Terms and Conditions of Sales effective on the date of the proposal, which are incorporated in full by this reference. The Air Therm Standard Terms and Conditions of Sale are available upon request and/or can be found on www.AirThermSavannah.com. Any conduct by Purchaser which recognizes the existence of a contract pertaining to the proposal shall be considered acceptance of this proposal and all its terms and conditions.
WORK EXCLUDED UNDER THIS AGREEMENT
The price of this agreement is based on providing routine maintenance to the equipment listed, but no maintenance plan can prevent or predict all potential equipment failures. Accordingly, we must exclude the following items:
- Consequential or incidental damages of any nature whatsoever.
- Expenses or losses resulting from failure, mis-adjustment or design deficiencies in equipment or systems not specifically included in this agreement.
- Failure of any non-maintainable component of equipment covered under this agreement.
- Water treatment to protect the equipment from damage or malfunction resulting from corrosion or erosion on the waterside of the equipment or caused by scale or sludge on internal tubes.
- Structural alterations to the premises where the equipment is installed, if necessary, for service or parts repair or replacement as provided for in this agreement. Painting, patching or insulation of piping, if removed to gain access to equipment being serviced.